After construction project in the architectural design phase static income. At least as important as the architectural design phase, this phase is carried out by civil engineers and structure throughout the life of the extent of structural elements and details to keep alive their accounts as a result of this stage are decided.
The main factors that will determine the soundness of the structure;
In the process of designing and drawing the static accuracy of accounts canceled
Under construction in the project was specified a static measurement and quality workmanship in accordance with details to make
Under construction in the project indicated static quality of construction materials used
Static criteria in the project under construction in labor and construction material is used observance be checked by experienced technical staff
Structure was built on solid ground is
All of these factors are very important of course but the first article to be made in respect of the static design is even more important than the rest. Because a good engineer, manufacturing errors can be made during the pre-calculates the anticipated this problem and will take during the technical measures may solve. Likewise, the static defects that may occur in building materials in the process of designing and take the necessary measures can be envisaged. Also with an experienced engineering services on weak ground and to build the desired structure can be projected. If, however, be considered otherwise false accounts were created as a result of incorrect drawings filled with a static project, the most perfect on the floor, with the best workmanship and best built under control even if the danger is. Because the structures likely to impact on the loads calculated incorrectly, it may constitute the structural elements of the impact load is correspondingly calculated and selected the wrong dimensions and details of structural elements also have been wrong. This situation is to perform construction workers or control elements to detect and fix is not possible because their task was created to project a static to an application and static account information, and will have no equipment. Therefore, the structure in the future will be forced to move against the weak is designed to load, the vertical and horizontal loads on the effects reach a maximum value of the damage claims, maybe even will migrate.
A doctor made a mistake with the surgery or the wrong place can lead to the death of a person with a diagnosis. However, a civil engineer, made the wrong calculations may lead to the death of dozens of people were destroyed because of a structure may be in the tens or even thousands of people. Our company has done work that is aware of the seriousness and responsibility. By the static design of our work all the calculations are done carefully and in our country with the static design is in force for the final regulations and standards that the earthquake in the region to do About Building Regulations 2007, TS 500-2000, TS 648, TS 498'e and all other specifications in accordance with the size and details are. Prepared by universities and civil engineers also symposia and courses odasınca have been following the developments and static knowledge about the world are struggling to keep pace.
PLEASE;
I need to make buildings earthquake-resistant as I am willing to sacrifice, you
Static building my project, by people who are competent on the job should get the time spent in a project, you
Static calculations in my building project in accordance with all existing regulations, it, computer programs do not take into account or taken the wrong times to get his attention from matters that are
Project drawings and specifications in accordance with the regulations, due weight has been shown, all production details are given in a format easily understood as you are
The newly developed during the project, the Performance Analysis of calculation methods used in the method get of you do
How much additional cost during the project how much more powerful than my house and I can make it earthquake-resistant performance with a structure that is building my cost difference between the settings I prefer to be consulted in are
Please CALL
PLEASE;
Of earthquake resistant building my no meaning for me of you do
Static building my project, work by people who understand a bit hurriedly done for me even though it does not matter of you do
Static calculations in my building project without complying with all existing regulations, computer programs do not take into account the particulars or the wrong times can also be taken into account before you are at,
Project drawings, albeit sloppy, and will not be fully understood and not important if you
During the project does not require the use of newly developed calculation method of you do
Stronger and more earthquake resistant buildings to make my building with my performance, exchanges between the cost structure is not important for me, for me you are the only significant low-cost structure,
CALL Do